OUR PROJECTS
 
TRUMP TOWER Şişli  2007
 Design inspection of two residential and commercail RC blocks situated in the heart of Istanbul. The construction undertaken by TAŞYAPI. Construction to be finalised in 2008.
 260.000 sqm (m2), 51-story
 Standart Inspection

Samsun Ayvacık Cable Stayed Motorway Bridge  2007
 EU funded cable stayed bridge motorway bridge with 336 m span designed in cooperation with Istanbul Technical University.
 
 Istanbul Technical University

CPK Tepeören Factory  2007
 RC and structural steel design delivered, construction and workshop process continues.
 24.000 sqm (m2)
 CPK Co. Ltd.

Çanakkale Seramik Yozgat Factory  2006
 Yozgat and Can factories of the leading ceramic producer in Turkey designed and detailed. Both factories started production in 2007.
 22.500 sqm (m2), 1.500 tonnes
 Çanakkale Seramik Inc.

Güzelce Highway Flyover  2005
 60 meter span steel suspended bridge and approaching ramps designed.
 
 Tanart Architects Co. Ltd.

Umur Print Inc. Dudullu Factory and Administrative Building  2005
 Steel truss bearing the administrative floor over a span of 50m designed and inspected. Innovative solutions were employed for this landmak structure.
 28.000 sqm (m2), 1.200 tonnes
 Özbakan Makina Co. Ltd.

Mashattan Residence Blocks  2005
 Design check of various RC residence blocks which stretch upto 42 stories in the finance and commerce center of Istanbul.
 420.000 sqm (m2)
 Standart Inspectıon Co. Ltd

KALEHOME CENTER, Steel Dome  2005
 28 meter steel dome designed on RC shopping center.
 160 tonnes
 Erbay Siding Systems Co. Ltd.

Avcılar Pedestrian Flyover  2005
 Total of 80 meter long steel pedestrian bridge, one of many designed in Istanbul.
 
 Özbakan Makina Co. Ltd.

Gümüşyaka Flyover  2005
 36 meter span steel pedestrian flyover and ramps designed and detailed in Istanbul.
 
 Tanart Architects

Silivri Park Pedestrian Flyover  2005
 Arch truss pedetrian flyover with a span of 50 metres.
 
 Kent Peyzaj Architecture

Besler Inc. Adana Soybean Facility  2004
 Expansion of Besler Inc. factory situated in Adana including piperack and silos.
 13.000 sqm (m2), 1.500 tonnes
 Çakıt Engineering Co. Ltd.

BESLER INC. Kurtköy Multi-story Warehouse  2004
 Designed from ground to superstructure for ÜLKER Holding. In-situ inspection conducted throughout workshop and erection process.
 14.000 sqm (m2), 4.200 tonnes
 Çakıt Engineering Co. Ltd

Maslak Ayazağa Highway Junction Bridge  2004
 240 meter steel deck 2 stem highway transition bridge detail designed and draught.
 
 Aryapı Inc.

TAI Turkish Aerospace Industries Inc. Aircraft Hangar, Ankara  
 Twin hangar structure designed for C-130 aircrafts. Each span is 46 metres with RC columns and steel roof structure allowing for entrance via tail gate.
 7.500 sqm (m2), 300 tonnes
 Dilara Engineering Co. Ltd.

NATO “Science for Stability Programme” - TCDD (Turkish State Railways) Rehabilitation Project. Directed by Prof. Dr. Erdoğan Uzgider the goal of the project was and still is to develop simple methods to assess fatigue life of existing Railway Bridges. The project involves static and dynamic bridge tests, data processing, computer modelling and developing analytical procedures to predict the remaining fatigue life of railway bridges. Mr.Kaya participated in the project on site and in laboratory testing as research assistant during his duty in Istanbul Technical University from 1991 to 1997.  
 
 
 

 
 